In 2006-2010 the new closed type substation with application of GIS (gas insulated substation)-110 kV, produced by ABB, and power transformers, produced in Czech republic, was constructed. All works were performed in the conditions of extreme constraint near the housing estate. The total amount of the contract was about 300 million rubles.